Pređi na sadržaj
WorkyBe
Plant and production operations

Manufacturing

Plant maintenance, line-level energy and machine monitoring for factories and production sites.

The operational tension

On a production site the two expensive numbers — downtime and energy — are usually measured at the wrong level. The stoppage is logged as an hour lost for the plant, and the energy arrives as one meter for the whole site, so neither can be traced to the line that caused it.

  • 01

    Unplanned stoppages are explained after the fact, not prevented.

  • 02

    Energy is measured for the whole site, never per line or machine.

  • 03

    Spare parts are ordered late because stock levels are unclear.

  • 04

    Maintenance history is split between binders and personal files.

How WorkyBe solves it

The first workflow to connect

  1. Step 1

    Build the asset hierarchy down to the machine, with its history, spares and documents attached.

  2. Step 2

    Convert the maintenance binder into calendar, counter and condition based plans.

  3. Step 3

    Record stoppages against the machine with cause, duration and cost, not as free text.

  4. Step 4

    Add sub-metering per line and read consumption next to shift and output.

The expected outcome

  • Downtime explained by cause and by machine, with a repeat-fault list to work from.
  • Planned work taking a growing share of the maintenance workload.
  • Energy cost attributable to a line and a shift rather than the whole site.

What is included

  • Asset hierarchy from building to line to individual machine.
  • Preventive, periodic and counter-based maintenance plans.
  • Fault records with root cause, downtime and cost per stoppage.
  • Warehouse, part movements and automatic requisition on low stock.
  • Sub-metering with cost distribution per line and per shift.
  • Sensor monitoring for temperature, pressure and run hours.

What this looks like in practice

A line stops for the fourth time in a quarter. The fault records show the same bearing and the same interval, so the plan moves from calendar-based to run-hour based and the spare is stocked before the next due date rather than after the next stoppage.

Frequently asked questions

Can WorkyBe trigger maintenance by run hours?
Yes. WorkyBe bases plans on a calendar, on counter values such as run hours, or on both, and creates the next due job automatically.
Does WorkyBe work with our existing meters?
WorkyBe connects remotely readable meters through its metering integrations, and accepts manual readings where automation is not available.
Can WorkyBe show the cost of a single stoppage?
Yes. WorkyBe collects labour, parts and external service costs on the work order, so each stoppage carries its own total cost.
Does WorkyBe have a shop floor friendly interface?
Yes. WorkyBe lets operators open a fault from a phone or tablet with a photo, without navigating the full system.

See it on actual data

Book a short demo for a guided walkthrough of the sites, meters and teams.

This website uses cookies